|
▬ You're the Project Manager ▬
Arranging Your Own Perfect Living and Working Environment
1. Consultation / Analysis (Engineering)
♦ Energy/Power Station
♦ Security System
♦ Recreation/Entertainment System
♦ Systems and Ergonomic Integration
♦ Research and Development
2. Implementation / Approach (Client / Owner)
(Design Your Own Setup - You Own It)
♦ Self Managed - Timeline / Expendatures
♦ Magnitude / Location / Scope
♦ Purchasing / Installation / Integration
♦ Optimization/ Expansion / Modification
3. Utilization / Purpose / Efficacy (Owner / Operator)
(Operate Your Own Facility)
♦ Self Managed -Timeline / Expendatures
♦ Optimization / Expansion / Modification
♦ Configuration / Interface / Ease of Use
♦ Monitoring / Maintenance / Unattended Modes
Optional • Processing - Continuous Improvement ♦ Statistical Controls
Initial Cost -->
<-- Initial Cost
|
Copyright © 2021-2025 2025 - 2112 Realitypoint.com inc.
|